PACIFIC PARTNERSHIP 2012 15 FEB 12 OPT Brief This brief is classified: UNCLASSIFIED
Roll Call CDS-7 State Dept – Mr. Weinz USNS MERCY AUS HQ JOC HQ JFNZ (RTN 29FEB) JSDF FLC-Yokosuka C7F • C3F • CTF 76 • 351st Civil Affairs Command • DLA Troop Support - Pacific • ETG • 30th NCR • HSC-21 DET 2 • MCAST Blue: Normal participants not expected to attend VTC due to scheduling conflict.
PP 12 Weekly Planning Rhythm 1100W read ahead slides posted to APAN CPF N3 Semi-Monthly Update 1200W MED WG Sun Mon Tues Wed Thurs Fri Sat 1300-1500W OPT VTC 1430W Comm Integration WG 1000W COMMS WG 1000W CA WG 1300W LOG WG 1200W ENG WG 1300W FP WG Every other week Effective 09 JAN
Planning Timeline EXORD PLANORD Mid Planning Conference Initial Planning Conference CPF RFF FSLO Letter MOU Letters Signed PN Invitation letters Final Initial Requirements Systems Assessment plan Country CONOPs Advanced Echelon PDSS Deployment
ADF Planning Status General Planning CJOPS Decision Brief for PP12 signed. Command Nomination of O-5 for position of COMASC submitted. Call for nominations for ASNCE staff sent via signal. Engineering Two (2) ADF engineers participated in Indonesia PDSS. Still awaiting Post Activity Report. Authorization to lead as FIE for Indonesia mission still to come from IPDIV. Medical Awaiting nominations for ADF Health PP12 positions from Services. No Change
ADF Participation Australia Command Element Engineering Section Medical Personnel contribution of 15 – 20 pers in each contingent Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia Health manning TBC in late November HQJOC Health PP12 POC: CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) kenneth.walters@defence.gov.au No Change
PP12 RFI Tracker No Change
JSDF Planning Status • CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities Vehicles - JMSDF ShipLST“OOSUMI” - JASDF Aircraft(C-130orKC-767×1) Medical team - Approximately 20~30
JSDF Planning Status • PDSS • -Re-survey Philippines with U.S. member in MAR 5~MAR 9 • Humanitarian community in Japan • - Not yet access(will recruit on Middle of FEB) • POC • - PLANNING • PRI: LCDR Haga : j3haga@jso.mod.go.jp DSN:224-7714 or 7723 • SEC: LCDR Yamaguchi : j3yamaguchi_m@jso.mod.go.jp • - MED • PRI: CDR Hayashizaki:j4hayashizaki@jso.mod.go.jp • SEC: MAJ Yamasaki:j4yamasaki@jso.mod.go.jp • - PA • CDR Maeyama: j1maeyama@jso.mod.go.jp No Change
JSDF Planning Status No Change
NZDF Planning Status NZDF will deploy a multi-disciplinary team of 8 personnel for the duration of the deployment to Vietnam 10 – 24 Jul 12. Exact composition is to be finalised in due course but likely to be as follows with specialties to be advised: 2 x Health Planners 1 x Medical Officer 1 x Nursing Officer 1 x Dentist or Dental Hygienist 2 x Medics 1 x Environmental Health Officer Outline SOM: - Embark USNS MERCY in Subic Bay, Philippines on or prior to 6 July 12. - Conduct tasks as personnel embedded into appropriate health capability bricks. - Disembark at conclusion of Vietnam mission. - RTNZ via either Hanoi or Ho Chi Minh City. No Change
CPF FOPS Update • CHIME will not be funded or replaced. • Pacific Partnership does not have a requirement for a CHIME-like system. • Funding does not exist to contract for a CHIME-like system.
Medical Update • Medical WG Telcon held Tuesday, 24 January 2012, 1200 hrs • LT JG Ward to attend MPC and stay to assist with Medical CONOPS development • Funding provided by CPF and MERCY • Medical assessment to Philippines is GTG • Per ODC during 1/24 telcon, medical assessment to Cambodia rescheduled • 26 March – 3 April No Change
Engineering Update Site Survey Projects Recommended SMEE Request Philippines 3 schools & 1 medical clinic P&E; Seawall Cambodia 3 health centers Water; Bldg Design Indonesia 3 health centers & 1 school Seismic; Disaster Vietnam 2 health centers Disaster; Safety Philippine Project Package preparation (ACB1 lead) Cambodia Project Package preparation (NMCB40 lead) Indonesia Project Package preparation (ADF lead/NMCB40 Alt) Vietnam Project Package preparation (NMCB40 lead) Engineering SMEE Plans. On-track Off-Track/Recoverable Off-Track not recoverable Completed
Logistics Update • Logistics WG held 14 Feb 12 • Logistics Resource Matrix In progress • Funding • APRI • MTF MERCY received $900K; DLA in receipt of $800K; total required $1.9M • Pharmaceuticals and Consumables • Donation Material • First pallets arriving from LDS • Next Logistics WG meeting scheduled for 21 Feb 12
PP12Supply and Logistics StatusFUNDING (15FEB12) 16 Completed On-track Off-Track/Recoverable Off-Track not recoverable
PP12 Supply and Logistics StatusPHARMACEUTICALS and CONSUMABLES (15FEB12) 17 NO CHANGE On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12 Supply and Logistics StatusDONATION MATERIAL (15FEB12) 18 On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(15FEB12) 19 On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(15FEB12) 20 No Change On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(15FEB12) 21 No Change On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status (15FEB12) 22 No Change On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(15FEB12) 23 On-track Off-Track/Recoverable Off-Track not recoverable Completed
Force Protection Update • Landside Security Force Tasking- with manpower • PIVA/TA update • Continued refinement of FP plans • Next FPWG- Tuesday, 21 Feb, 1300 HST • Pre-Deployment travel Requirements • Updated ISOPREPs • APACS • iATP • AOR location specific brief • Level I ATFP • SERE 100 B
Projected Host and Partner Nation Participation by Port (15 FEB 2012)
Public Affairs Update • Admin • BGAN- CPF COMCAM will provide BGAN and limited airtime for emergency use/last resort transmission capability • Media Coordination • MERCY tour – 16 FEB at 1100 for Gus Blackmon and Whittney Beatty (Warner Bros/Telepictures production crew)
Public Affairs Update On-track Off-Track/Recoverable Off-Track not recoverable Completed
Public Affairs Update On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12 Communication Integration Identified initial list of communication “products” at MPC Posters, gift, backpacks, SMEE aids, etc. Coordinating communication assessment support for PP12 (MAY – SEP 12) Developing media analysis approach Finalizing linguist candidates to support in-country media analysis, and CA/PA engagement Next CIWG meeting scheduled for: 16 FEB 12 AMEMB Cambodia, Vietnam Telecons Additional telecon to be conducted during LCDR Lohmeyer’s visit (SLV)
PP12 Communication Integration 31 Completed On-track Off-Track/Recoverable Off-Track not recoverable
PP12 Communication Integration 32 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Planning Timeline INDICATES UPDATE UPDATED: 08FEB12
Mission Commander Priorities Country CONOPS Development 17FEB: CONOPS addendum updates due to CDS7 from planning leads TBD: CONOPS Annex updates due to CDS7 24FEB: Updated EAPs for CONOPS ADVON Composition / Notification 17FEB: Finalize composition Voyage Planning Initial planning complete, SOM in CONOPS is executable, on track to submit transit plan by D-60 SOM for initial 2 PVSTs may shift 1 day to left to prevent overtime in Pearl/Guam (currently sked for Saturday departures from both); no effect on mission ports MRX Planning 15FEB: Stakeholders provide input to CDS7 N3 on objectives / participation
Mission Commander Priorities (continued) Pre-deployment Briefings 02APR 1630 PST (030030ZAPR12) – CTF76 (VTC) TBD – C3F TBD – C7F TBD – CPF Maritime Operations Center (MOC) / MOC Beach Det Watchfloor on MERCY and ashore Products in development: SORM PPRs Checklists Watchbill PP12 Mission Planning Rhythm In development
Closing Questions/Comments CPF Staff State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 • 351st Civil Affairs Command • DLA Troop Support - Pacific • 30th NCR • ETG • HSC-21 DET 2 • MCAST • USNS MERCY • CDS-7