380 likes | 533 Views
PACIFIC PARTNERSHIP 2012. 22 FEB 12 OPT Brief. This brief is classified: UNCLASSIFIED. Roll Call. CDS-7 State Dept – Mr. Weinz USNS MERCY AUS HQ JOC HQ JFNZ (RTN 29FEB) JSDF FLC-Yokosuka C7F. C3F CTF 76 351 st Civil Affairs Command DLA Troop Support - Pacific ETG 30 th NCR
E N D
PACIFIC PARTNERSHIP 2012 22 FEB 12 OPT Brief This brief is classified: UNCLASSIFIED
Roll Call CDS-7 State Dept – Mr. Weinz USNS MERCY AUS HQ JOC HQ JFNZ (RTN 29FEB) JSDF FLC-Yokosuka C7F • C3F • CTF 76 • 351st Civil Affairs Command • DLA Troop Support - Pacific • ETG • 30th NCR • HSC-21 DET 2 • MCAST Blue: Normal participants not expected to attend VTC due to scheduling conflict.
PP 12 Weekly Planning Rhythm 1100W read ahead slides posted to APAN CPF N3 Semi-Monthly Update 1200W MED WG Sun Mon Tues Wed Thurs Fri Sat 1300-1500W OPT VTC 1430W Comm Integration WG 1000W COMMS WG 1000W CA WG 1300W LOG WG 1200W ENG WG 1300W FP WG Every other week Effective 09 JAN
Planning Timeline EXORD PLANORD Mid Planning Conference Initial Planning Conference CPF RFF FSLO Letter MOU Letters Signed PN Invitation letters Final Initial Requirements Systems Assessment plan Country CONOPs Advanced Echelon PDSS Deployment
ADF Planning Status General Planning CJOPS Decision Brief for PP12 signed. Command CMDR Ken Walters, RAN confirmed as Commander Australian Contingent. Small number of ASNCE staff remain to be identified. Engineering 12 engineers confirmed to participate as FIE in Indonesia. Medical All Personnel for ADF Health PP12 positions identified. Credentialing to follow.
ADF Participation Command Element O-5 Commander and 4/5 support staff. CIMIC 2 personnel. Engineering Section 12 person section. FIE Indonesia & SIE for remainder of mission. Medical Contribution of 20 personnel in each contingent. Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines. Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia. HQJOC Health PP12 POC: CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans) kenneth.walters@defence.gov.au
PP12 RFI Tracker No Change
JSDF Planning Status • CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities Vehicles - JMSDF ShipLST“OOSUMI” - JASDF Aircraft(C-130orKC-767×1) Medical team - Approximately 20~30 No Change
JSDF Planning Status • PDSS • -Re-survey Philippines with U.S. member in MAR 5~MAR 9 • Humanitarian community in Japan • - Recruit on 21 FEB • POC • - PLANNING • PRI: LCDR Haga : j3haga@js.mod.go.jp DSN:224-7714 or 7723 • SEC: LCDR Yamaguchi : j3yamaguchi_m@js.mod.go.jp • - MED • PRI: CDR Hayashizaki:j4hayashizaki@js.mod.go.jp • SEC: MAJ Yamasaki:j4yamasaki@js.mod.go.jp • - PA • CDR Maeyama: j1maeyama@js.mod.go.jp
JSDF Planning Status No Change
NZDF Planning Status NZDF will deploy a multi-disciplinary team of 8 personnel for the duration of the deployment to Vietnam 10 – 24 Jul 12. Exact composition is to be finalised in due course but likely to be as follows with specialties to be advised: 2 x Health Planners 1 x Medical Officer 1 x Nursing Officer 1 x Dentist or Dental Hygienist 2 x Medics 1 x Environmental Health Officer Outline SOM: - Embark USNS MERCY in Subic Bay, Philippines on or prior to 6 July 12. - Conduct tasks as personnel embedded into appropriate health capability bricks. - Disembark at conclusion of Vietnam mission. - RTNZ via either Hanoi or Ho Chi Minh City. No Change
CPF FOPS Update • Manning Update • Approximately 70 billets being filled by FFC will be in 07MAR SDOB. • Unknown if USARC will fill the 16 CA billets.
Medical Update • Medical WG Telcon held Tuesday, 21 February 2012, 1200 hrs • Medical Assessment to Philippines completed; full report to follow early next week • “Push back” from Political Officer at USEMB IRT medical assessment to Cambodia • In the process of confirming this with ODC • Discussed new provider credential requirements with Philippine DoH and AFP representatives • Will be meeting with Philippine Consulate to review waiver procedures • Received word that Indonesia might want to follow similar procedures
Engineering Update Site Survey Projects Recommended SMEE Request Philippines 3 schools & 1 medical clinic P&E; Seawall Cambodia 3 health centers Water; Bldg Design Indonesia 3 health centers & 1 school Seismic; Disaster Vietnam 2 health centers Disaster; Safety Philippine Project Package preparation (ACB1 lead) Cambodia Project Package preparation (NMCB40 lead) Indonesia Project Package preparation (ADF lead/NMCB40 Alt) Vietnam Project Package preparation (NMCB40 lead) Engineering SMEE Plan. Life Support Requirements. On-track Off-Track/Recoverable Off-Track not recoverable Completed
Logistics Update • Logistics WG held 21 Feb 12 • Logistics Resource Matrix Completed • Funding • APRI • MTF MERCY received $900K; DLA in receipt of $800K; total required $1.9M • Pharmaceuticals and Consumables • Donation Material • Received Worldwide Vets Donation Pallets • First pallets arriving from LDS 23 Feb 12 • Next Logistics WG meeting scheduled for 28 Feb 12
PP12Supply and Logistics StatusFUNDING (22FEB12) 16 Completed On-track Off-Track/Recoverable Off-Track not recoverable
PP12 Supply and Logistics StatusPHARMACEUTICALS and CONSUMABLES (22FEB12) NO CHANGE 17 On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12 Supply and Logistics StatusDONATION MATERIAL (22FEB12) 18 On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(22FEB12) 19 On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(22FEB12) 20 On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(22FEB12) 21 No Change On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(22FEB12) 22 No Change On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12CIS Information Systems Status(22FEB12) 23 On-track Off-Track/Recoverable Off-Track not recoverable Completed
Force Protection Update • Landside Security Force Tasking- C7F TaskOrd status • FP concerns with outdoor RONs • Next FPWG review from yesterday • Pre-Deployment travel Requirements • Updated ISOPREPs • APACS • iATP • AOR location specific brief • Level I ATFP • SERE 100 B
Projected Host and Partner Nation Participation by Port (22 FEB 2012)
Public Affairs Update • Admin • NPASE Det (DPAO, LCPO, 4 MCs) officially assigned to DESRON • Media Coordination • NSTR
Public Affairs Update On-track Off-Track/Recoverable Off-Track not recoverable Completed
Public Affairs Update On-track Off-Track/Recoverable Off-Track not recoverable Completed
PP12 Communication Integration Identified initial list of communication “products” at MPC Posters, gifts, backpacks, SMEE aids, etc. Coordinating communication assessment support for PP12 (MAY – SEP 12) Developing media analysis approach Finalizing linguist candidates to support in-country media analysis, and CA/PA engagement Next CIWG meeting scheduled for: 29 FEB 12 AMEMB Cambodia, Vietnam Telecons Additional telecon to be conducted during LCDR Lohmeyer’s visit (SLV)
PP12 Communication Integration 32 Completed On-track Off-Track/Recoverable Off-Track not recoverable
PP12 Communication Integration 33 Completed On-track Off-Track/Recoverable Off-Track not recoverable
Flag Engagement Plan No Change
Planning Timeline UPDATED: 08FEB12
Mission Commander Priorities Country CONOPS Development 17FEB: CONOPS addendum updates due to CDS7 from planning leads 24FEB: Updated EAPs for CONOPS 24FEB: CONOPS Annex (Medical / Vet / Eng) due to CDS7 25-28FEB: SLV debrief and CONOPS review by CDRE 29FEB: CONOPS forwarded to CPF 01MAR: begin tactical level planning ADVON Composition / Notification 28FEB: CDRE approve composition 29FEB: Composition forwarded to CPF Voyage Planning 21FEB: Updated SOM submitted to CPF (complete) C3F providing update to CPF for major sked change Chop to C7F: 16MAY12 Chop to C3F: 31AUG12 RTHP: 14SEP12 25FEB: Transit plan due to CDS7 29FEB: Transit plan due to C3F/C7F (on track)
Mission Commander Priorities (continued) MRX Planning 15FEB: Stakeholders provide input to CDS7 N3 on objectives / participation 23FEB: MRX planning TELCON Participants: MTF MERCY: LCDR Ashmore MERCY: ??? HSC 21: LCDR Uddenberg / LT Adams ENG: LT Hamrock CDS7: OPS, FP, Comms, & PAO reps BPT discuss schedule and provide input on number of training audience personnel at each MRX venue Pre-deployment Briefings 02APR 1630 PST (030030ZAPR12) – CTF76 (VTC) TBD – C3F (27MAR – proposed) TBD – C7F (04APR – proposed) TBD – CPF (06APR – proposed)
Closing Questions/Comments CPF Staff State Dept – Mr. Weinz AUS HQ JOC HQ JFNZ JSDF FLC-Yokosuka C7F C3F CTF 76 • 351st Civil Affairs Command • DLA Troop Support - Pacific • 30th NCR • ETG • HSC-21 DET 2 • MCAST • USNS MERCY • CDS-7